Ram Jack west commercial case study

Spring St. Duplex

Scope of work

Ram Jack West installed 41 Ram Jack micro piles with pre-construction plates to an average depth of 35 ft. We performed a verification test: one load test to 200% of design load, for a 30-kip pile that would be 60-kips.

Project images

Project Location
Newport, Oregon
project owner or general contractor
N/A
type of work
Micro Piles